Questions Bank
process of calculating present value of projected cash flows
process of allocating costs to cost centers or cost objects
mathematical description of how a cost changes with changes in the level of an activity relating to that cost
is a very thorough and detailed way to identifying a cost object when there is a physical relationship between inputs and outputs
y = a + bX
y = b
y = bX
y = a
variable cost
mixed cost
irrelevant cost
fixed cost
y = 1.90 + 570X
y = 570 + 1.90X
y = 570 + 1.07X
y = 1.07 + 570X
y = 55,000 + 120X
y = 1,300 + 55,000X
y = 55,000 + 1,300X
y = 1,300 + 120X