Question 1
Free
Multiple Choice

A cost function is a ________ .

Choose correct answer/s
A

process of calculating present value of projected cash flows

B

process of allocating costs to cost centers or cost objects

C

mathematical description of how a cost changes with changes in the level of an activity relating to that cost

D

is a very thorough and detailed way to identifying a cost object when there is a physical relationship between inputs and outputs

Check answer
Question 2
Free
Multiple Choice

Bennet Company employs 20 individuals. Eighteen employees are paid $18 per hour and the rest are salaried employees paid $3,000 a month. Which of the following is the total cost function of personnel?

Choose correct answer/s
A

y = a + bX

B

y = b

C

y = bX

D

y = a

Check answer
Question 3
Free
Multiple Choice

Crimson Services, Inc., employs 8 individuals. They are all paid $16.50 per hour. How would total costs of personnel be classified?

Choose correct answer/s
A

variable cost

B

mixed cost

C

irrelevant cost

D

fixed cost

Check answer
Question 4
Free
Multiple Choice

For February, the cost components of a picture frame include $0.40 for the glass, $0.67 for the wooden frame, and $0.83 for assembly. The assembly desk and tools cost $570. Two hundred fifty frames are expected to be produced in the coming year. What cost function best represents these costs?

Choose correct answer/s
A

y = 1.90 + 570X

B

y = 570 + 1.90X

C

y = 570 + 1.07X

D

y = 1.07 + 570X

Check answer
Question 5
Free
Multiple Choice

The cost components of a heater include $35 for the compressor, $11 for the sheet molded compound frame, and $74 per unit for assembly. The factory machines and tools cost is $55,000. The company expects to produce 1,300 heaters in the coming year. What cost function best represents these costs?

Choose correct answer/s
A

y = 55,000 + 120X

B

y = 1,300 + 55,000X

C

y = 55,000 + 1,300X

D

y = 1,300 + 120X

Check answer
Question 6
Multiple Choice

Which of the following statements is true of a linear cost function?

Choose correct answer/s
A
It presents variable cost as a slope coefficient.
B
It presents total cost as an intercept.
C
It presents variable cost as an intercept.
D
It presents total cost as slope coefficient.
To unlock the question
Question 7
Multiple Choice

A finance manager has to select one of the four different suppliers of raw materials. The total cost functions under the four options are given below. Assume the quality of the raw material to be the same, which of the following is preferred by the finance manager?

Choose correct answer/s
A
y = 600 + 4.96X
B
y = 600 + 5.49X
C
y = 600 + 4.41X
D
y = 600 + 4.67X
To unlock the question
Question 8
Multiple Choice

If the total cost function is y = 6,500 + 9X, calculate the variable cost for 4,400 units.

Choose correct answer/s
A
$46,100
B
$39,600
C
$58,500
D
$6,500
To unlock the question
Question 9
Multiple Choice

The cost function y = 2,700 + 8X ________ .

Choose correct answer/s
A
has a slope coefficient of 2,700
B
has an intercept of 8
C
is a straight line
D
represents a fixed cost
To unlock the question
Question 10
Multiple Choice

The cost function y = 300 + 2X ________ .

Choose correct answer/s
A
has a slope coefficient of 300
B
has an intercept of 300
C
is a nonlinear
D
represents a fixed cost
To unlock the question
Question 11
Multiple Choice

The cost function y = 13,000 + 9X ________ .

Choose correct answer/s
A
represents a mixed cost
B
will intersect the y-axis at 9
C
has a slope coefficient of 13,000
D
is a curved line
To unlock the question
Question 12
Multiple Choice

Which of the following functions represents the least total cost assuming the number of units is equal in each case?

Choose correct answer/s
A
y = 180 + 9X
B
y = 90 + 5X
C
y = 90 + 9X
D
y = 180 + 5X
To unlock the question
Question 13
Multiple Choice

Which of the following is an equation of a fixed cost function?

Choose correct answer/s
A
y = (a + b)?
B
y = a + bX
C
y = bX
D
y = a
To unlock the question
Question 14
True/False

One assumption frequently made in cost behavior estimation is that changes in total costs can be explained by changes in the level of a single activity.

Choose correct answer/s
True
False
To unlock the question
Question 15
True/False

A cost function is a mathematical description of how a cost changes with changes in the level of an activity relating to that cost.

Choose correct answer/s
True
False
To unlock the question
Question 16
True/False

All cost functions are linear.

Choose correct answer/s
True
False
To unlock the question
Question 17
True/False

In a cost function y = 18,000, the slope coefficient is zero.

Choose correct answer/s
True
False
To unlock the question
Question 18
True/False

When estimating a cost function, cost behavior can be approximated by a linear cost function within the relevant range.

Choose correct answer/s
True
False
To unlock the question
Question 19
True/False

If a cost item is fixed for one cost object, it will be fixed for all cost objects for which it is associated.

Choose correct answer/s
True
False
To unlock the question
Question 20
True/False

All other things being equal, the longer the time horizon the more likely a cost will be fixed.

Choose correct answer/s
True
False
To unlock the question