The goal of maintenance is to maintain the productive system in good working order while minimizing or eliminating the cost of preventive maintenance.
Choose correct answer/s
True
False
Check answer
Question 3
Free
True/False
Breakdown maintenance includes activities such as equipment inspection and adjustment.
Choose correct answer/s
True
False
Check answer
Question 4
Free
True/False
Degree of technology is a factor affecting the decision of how much preventive maintenance is desirable.
Choose correct answer/s
True
False
Check answer
Question 5
Free
True/False
Breakdown maintenance is best performed on a regularly scheduled basis.
Choose correct answer/s
True
False
Check answer
Question 6
True/False
One basis for scheduling preventive maintenance is passage of time.
Choose correct answer/s
True
False
To unlock the question
Question 7
True/False
Ideally, preventive maintenance will be performed before a breakdown or failure.
Choose correct answer/s
True
False
To unlock the question
Question 8
True/False
In the broadest sense, preventive maintenance extends back to the installation stage of equipment and facilities.
Choose correct answer/s
True
False
To unlock the question
Question 9
True/False
Pareto analysis (using the 80/20 rule) is one method of determining when preventive maintenance activities should be performed.
Choose correct answer/s
True
False
To unlock the question
Question 10
True/False
In the area of maintenance, the Pareto phenomenon is reflected in the fact that, regardless of problem classification, all equipment will justify about the same expense.
Choose correct answer/s
True
False
To unlock the question
Question 11
Multiple Choice
As a piece of equipment begins to break down more often, the manager is often faced with a trade-off in which __________ are weighed against the __________ .
Choose correct answer/s
failure rates; maintenance probabilities
maintenance intervals; maintenance programs
operating costs; variable costs
replacement costs; continued maintenance costs
fixed costs; maintenance costs
To unlock the question
Question 12
Multiple Choice
Suppose that for a particular piece of machinery, the frequency distribution of monthly breakdowns is as follows: The cost of a breakdown is $2,000, and the cost of a preventive maintenance program is $2,000 per month. If the preventive maintenance program is adopted, the probability of a machine breakdown is negligible. How much better off per month would the firm be if it adopted preventive maintenance?
Choose correct answer/s
$100 worse off
$200 worse off
$100 better off
$200 better off
$2,000 better off
To unlock the question
Question 13
Multiple Choice
Suppose that for a particular piece of machinery, the frequency distribution of monthly breakdowns is as follows: The cost of a breakdown is $2,000, and the cost of a preventive maintenance program is $2,000 per month. If the preventive maintenance program is adopted, the probability of a machine breakdown is negligible. How much better off per month would the firm be if it adopted preventive maintenance?
Choose correct answer/s
$100 worse off
$200 worse off
$100 better off
$200 better off
$2,000 better off
To unlock the question
Question 14
Multiple Choice
Suppose that the average time before breakdown is normally distributed with a mean of 2.5 weeks and a standard deviation of .4 weeks. If breakdowns cost an average of $1,200 and preventive maintenance costs $800, what is the optimal maintenance interval?
Choose correct answer/s
Every .67 weeks
Every .33 weeks
Every 2.67 weeks
Every 3.25 weeks
Every 3.12 weeks
To unlock the question
Question 15
Multiple Choice
Maintenance activities are often organized into the following two groups:
Choose correct answer/s
breakdown maintenance and preventive maintenance
breakdown maintenance and predictive maintenance
preventive maintenance and predictive maintenance
equipment maintenance and breakdown maintenance
equipment maintenance and buildings maintenance
To unlock the question
Question 16
Multiple Choice
Breakdown maintenance is _____________ ; preventive maintenance is _________ .
Choose correct answer/s
reactive; proactive
proactive; reactive
expensive; inexpensive
inexpensive; expensive
easy; hard
To unlock the question
Question 17
Multiple Choice
The goal of maintenance is to maintain the productive system in good working order while minimizing:
Choose correct answer/s
total preventive maintenance costs.
total breakdown maintenance costs.
total maintenance costs.
the difference between preventive and breakdown costs.
the ratio of breakdown to preventive maintenance costs.
To unlock the question
Question 18
Multiple Choice
___________ is most closely associated with breakdown maintenance.
Choose correct answer/s
Equipment adjustment
Equipment cleaning
Equipment inspection
Repair of broken parts
Replacement of worn parts
To unlock the question
Question 19
Multiple Choice
Factors affecting the decision of how much preventive maintenance is desirable typically include all of the following except:
Choose correct answer/s
age of equipment.
type of product.
degree of technology.
type of production process.
condition of equipment.
To unlock the question
Question 20
Multiple Choice
Potential costs of equipment breakdown do not include: