Question 1
Free
Multiple Choice

The two types of data involved in quality control are:

Choose correct answer/s
A

Assignable factors and random factors.

B

Variables and attributes.

C

Random measurements and 100 percent measurements.

D

Accuracy and precision.

Check answer
Question 2
Free
Multiple Choice

"Pass/ fail" and "go/no go" are both examples of:

Choose correct answer/s
A

Attribute data.

B

Decision data.

C

Process flow data.

D

Variable data.

Check answer
Question 3
Free
Multiple Choice

The width of a histogram showing a distribution of data indicates the __________ of the process that generated the distribution.

Choose correct answer/s
A

Predictability

B

Average

C

Bias

D

Central tendency

Check answer
Question 4
Free
Multiple Choice

Zanda Corp.has determined that it has too many products returned from customers.Zanda is interested in determining what factors or elements could contribute to the large number of returns.Which of the following quality tools would Zanda use to achieve this objective?

Choose correct answer/s
A

Process flowchart

B

Pareto analysis

C

Fishbone diagram

D

Run diagram

E

Scatter diagram

Check answer
Question 5
Free
Multiple Choice

You are involved in the implementation of a quality improvement program.Your immediate goal is to identify what problems you should focus on (ideally you want to focus on those that give you the biggest bang for the buck).Which of the following quality control procedures is the most appropriate?

Choose correct answer/s
A

Fishbone diagrams

B

Process flow charts

C

Pareto analysis

D

Histograms

Check answer
Question 6
Multiple Choice

Suppose that you are a process manager in a manufacturing plant, and you suspect that there is a relationship between the room temperature of the plant and the weights of the plastic caps produced by an injection molding process.What quality improvement tool would you use to investigate this claim?

Choose correct answer/s
A
Fishbone diagram
B
Check list
C
Pareto analysis
D
Histogram
E
Scatter diagram
To unlock the question
Question 7
Multiple Choice

The specifications for the diameter of a molded part are 10 mm ± 0.5 mm.The actual average and standard deviation from 250 parts sampled is 10.1 mm and 0.1 mm, respectively.What is the process capability as measured by Cp?

Choose correct answer/s
A
0.84
B
1.67
C
0.60
D
1.00
E
1.01
To unlock the question
Question 8
Multiple Choice

The specifications for the diameter of a molded part are 10 mm ± 0.5 mm.The actual average and standard deviation from 250 parts sampled is 10.1 mm and 0.1 mm, respectively.What is Cpk?

Choose correct answer/s
A
0.81
B
1.01
C
0.33
D
1.34
E
0.80
To unlock the question
Question 9
Multiple Choice

The specifications for the diameter of a molded part are 10 mm ± 0.5 mm.The actual average and standard deviation from 250 parts sampled is 10.1 mm and 0.1 mm, respectively.The process can be characterized as:

Choose correct answer/s
A
Capable.
B
Unreliable.
C
Just barely capable.
To unlock the question
Question 10
Multiple Choice

A firm has an existing process that it would like to use for producing a part it will sell to an industrial customer.The customer requires that defective (out of specification) parts be kept to 3,000 parts per million (three-tenths of 1 percent) or less.A process capability study done on the process revealed that it has a process capability index (Cpk) of 1.00 for this part.What should the firm conclude from the study?

Choose correct answer/s
A
The process is not capable, but with careful process control, it could be used to meet the customer's requirements.
B
The process is highly capable, and when operating in control, a very high percentage of output will meet the customer's requirements.
C
The process is not capable, and even with careful control, it will not be able to meet the customer's requirements.
D
The process is capable, but just barely, and will require careful monitoring in order to meet customer requirements.
To unlock the question
Question 11
Multiple Choice

Sample means and ranges were obtained for five samples of 10 units per sample from a production process.Assume the process was considered to be in control during the period these samples were collected.The results are as follows: 1 10.58 .23
2 9)97 .25
3 9)99 .21
4 10.23 .28
5 10.23 .28
What is the central line of the X chart for this process

Choose correct answer/s
A
10.00
B
10.05
C
10.20
D
9.45
E
9.75
To unlock the question
Question 12
Multiple Choice

Sample means and ranges were obtained for five samples of 10 units per sample from a production process.Assume the process was considered to be in control during the period these samples were collected.The results are as follows: 1 10.58 .23
2 9)97 .25
3 9)99 .21
4 10.23 .28
5 10.23 .28
LCL for the three sigma X chart for the process is approximately (for a sample size of 10, A2 = 0.31):

Choose correct answer/s
A
10.12.
B
10.05.
C
10.94.
D
9.44.
E
9.75.
To unlock the question
Question 13
Multiple Choice

The objective of statistical process control (SPC) is to:

Choose correct answer/s
A
Determine whether a batch of raw materials should be accepted or rejected.
B
Determine whether a batch of finished goods should be accepted or rejected.
C
Detect assignable cause variations versus normal random variations in the process.
D
Identify variable versus attribute measures.
To unlock the question
Question 14
Multiple Choice

Hugging in a control chart usually indicates:

Choose correct answer/s
A
The process is out of control.
B
Systematic problems in the process that require attention.
C
The process is in control.
D
Something is occurring that is masking natural variation.
To unlock the question
Question 15
Multiple Choice

The Taguchi methods link process design to:

Choose correct answer/s
A
Customer expectations.
B
Production availability.
C
Process capability.
D
Unexplained variance.
To unlock the question
Question 16
Multiple Choice

Which of the following categories of causes would be most appropriate for a Marriott (an international hotel chain) or McDonalds (an international fast food chain) or the local hair stylist?

Choose correct answer/s
A
People, Machine/Equipment, Methods/Processes, Materials
B
Machine, Method, Material, Manpower/Mindpower, Measurement, Mother Nature
C
Product, Price, Place, Promotion, People/personnel, Process, Physical evidence
D
People, Price, Machine, Materials, Mother Nature
To unlock the question
Question 17
Multiple Choice

Which of the following tools is most appropriate when we are interested in determining if a process that was generating attribute-type data (pass/fail, good/bad) was under control?

Choose correct answer/s
A
p control chart
B
control chart image
C
Scatterplot
D
Histogram
To unlock the question
Question 18
Multiple Choice

You have been given the following data: Specification information: Anything between 10 and 20 units per order is acceptable.
Process Mean: 13
Upper limit of the process: 16 Lower limit of the process: 10
Using this information, which of the following conclusions is most appropriate?

Choose correct answer/s
A
The process is not capable since it is not centered.
B
The process is barely capable and not centered.
C
The process is capable and centered.
D
The process is not capable and centered.
To unlock the question
Question 19
Multiple Choice

You have been given the following sample information that has been drawn from the last sample taken: Mean of the sample: 12.50
Lower control limit for the range: 0 Upper control limit for the range: 10.6
Observations: 13, 12, 8, 10, 11, 16, 17, 8, 17, 18, 20, 14 Which of the following conclusions does this data support?

Choose correct answer/s
A
The process is under control.
B
The process is not under control.
C
The sample is within specifications.
D
The sample is out of specification.
To unlock the question
Question 20
Multiple Choice

You are given the following data for taillight assemblies: image Which of the following tools does this data represent?

Choose correct answer/s
A
Cp/Cpk analysis
B
Histogram
C
Control chart
D
Check sheet
To unlock the question