Question 1
Free
True/False

MRP works best if the inventory items have dependent demand.

Choose correct answer/s

True

False

Check answer
Question 2
Free
True/False

Low-level coding represents items less than $18 per unit.

Choose correct answer/s

True

False

Check answer
Question 3
Free
True/False

Independent demand tends to be more "lumpy" than dependent demand, meaning that we need large quantities followed by periods of no demand.

Choose correct answer/s

True

False

Check answer
Question 4
Free
True/False

Lumpy demand for components results primarily from the periodic scheduling of batch production.

Choose correct answer/s

True

False

Check answer
Question 5
Free
True/False

MRP is used within MRP II systems.

Choose correct answer/s

True

False

Check answer
Question 6
True/False

The master production schedule states which end items are to be produced, in addition to when and how many.

Choose correct answer/s
True
False
To unlock the question
Question 7
True/False

Net requirements equal gross requirements minus safety stock.

Choose correct answer/s
True
False
To unlock the question
Question 8
True/False

The master schedule needs to be for a period long enough to cover the stacked or cumulative lead time necessary to produce the end items.

Choose correct answer/s
True
False
To unlock the question
Question 9
True/False

Initially, the output from MRP may not represent a feasible schedule.

Choose correct answer/s
True
False
To unlock the question
Question 10
True/False

MRP, considering inventory position, bills of material, open purchase orders, and lead times guarantees a feasible production plan if the inputs to MRP are accurate.

Choose correct answer/s
True
False
To unlock the question
Question 11
True/False

The bill of materials indicates how much material will be needed to produce the quantities on a given master production schedule.

Choose correct answer/s
True
False
To unlock the question
Question 12
True/False

A bill of materials contains a listing of all the assemblies, parts, and materials needed to produce one unit of an end item.

Choose correct answer/s
True
False
To unlock the question
Question 13
True/False

The bill of materials contains information on lead times and current inventory position on every component required to produce the end item.

Choose correct answer/s
True
False
To unlock the question
Question 14
True/False

The inventory records contain information on the status of each item by time period.

Choose correct answer/s
True
False
To unlock the question
Question 15
True/False

An assembly-time chart indicates gross and net requirements taking into account the current available inventory.

Choose correct answer/s
True
False
To unlock the question
Question 16
True/False

MRP II did not replace the basic MRP.

Choose correct answer/s
True
False
To unlock the question
Question 17
True/False

The gross requirements at one level of an MRP plan determine the gross requirements at the next lower level continuing on down to the lowest levels shown on the bill of materials.

Choose correct answer/s
True
False
To unlock the question
Question 18
True/False

The gross requirements value for any given component is equal to the net requirements of that component's immediate parent multiplied by the quantity per parent.

Choose correct answer/s
True
False
To unlock the question
Question 19
True/False

The term pegging refers to identifying the parent items that have generated a given set of material requirements for a part or subassembly.

Choose correct answer/s
True
False
To unlock the question
Question 20
True/False

A net-change MRP system is one that is updated periodically but not less frequently than once a week.

Choose correct answer/s
True
False
To unlock the question