Sales And Operations Planning

This question bank verified by Studydeets
All Questions
Filter by:
Question 1
Free
Multiple Choice

MRP is a process that would be most applicable in which situation?

Choose correct answer/s
A

Planning requirements for repair parts for production equipment in a manufacturing plant.

B

Planning requirements for safety stocks of finished goods in a distribution center.

C

Planning requirements for bicycle seats in a bicycle production plant.

D

None of these.

Check answer
Question 2
Free
Multiple Choice

Materials requirement planning (MRP) systems are used primarily to:

Choose correct answer/s
A

Plan orders.

B

Plan lead time.

C

Plan amounts of end items to produce.

D

Plan distribution.

Check answer
Question 3
Free
Multiple Choice

Planning for which of the following products would see the LEAST benefit from the use of an MRP system?

Choose correct answer/s
A

Microwave ovens

B

Mobile phones

C

Shampoo

D

Power lawnmowers

Check answer
Question 4
Free
Multiple Choice

The quantities of end items to be completed in each time period into the future is shown in a(n):

Choose correct answer/s
A

MRP.

B

MPS.

C

BOM.

D

ERP.

Check answer
Question 5
Free
Multiple Choice

The longest lead time path in the BOM is the:

Choose correct answer/s
A

Time bucket.

B

Planning horizon.

C

Time window.

D

Cumulative lead time.

Check answer
Question 6
Multiple Choice

If the cumulative lead time is 8 weeks, to be feasible the MPS planning horizon must be:

Choose correct answer/s
A
Exactly 8 weeks.
B
At least 8 weeks.
C
Less than 8 weeks.
D
At least 16 weeks.
To unlock the question
Question 7
Multiple Choice

A master production schedule shows the following information: image Using a lot-for-lot rule, what is the MPS quantity for period 1?

Choose correct answer/s
A
90
B
80
C
100
D
40
To unlock the question
Question 8
Multiple Choice

A master production schedule shows the following information: image What is the available to promise for period 2?

Choose correct answer/s
A
0.
B
-20.
C
20.
D
None of these.
To unlock the question
Question 9
Multiple Choice

A master production schedule shows the following information: image Using a lot-for-lot rule, what is the MSP quantity for week 4?

Choose correct answer/s
A
500
B
400
C
450
D
50
To unlock the question
Question 10
Multiple Choice

A master production schedule shows the following information: image Based on the information in the MPS, what is the amount that is available to promise in week 4?

Choose correct answer/s
A
1,200
B
700
C
500
D
1,500
To unlock the question
Question 11
Multiple Choice

Which of the following is NOT an input into the MRP?

Choose correct answer/s
A
Bill of materials
B
Inventory records file
C
Master production schedule
D
Planned order release
To unlock the question
Question 12
Multiple Choice

A bill-of-materials file contains:

Choose correct answer/s
A
Invoices for materials that must be paid in this period.
B
Lists of materials required to produce end item products.
C
Accounts payable for materials.
D
None of these.
To unlock the question
Question 13
Multiple Choice

End item A is made by assembling 2 of part B and 3 of part C.Part C is made from 2 of component D and 2 of component E.Component D is considered to be a:

Choose correct answer/s
A
Level 0.
B
Level 1 input.
C
Level 2 input.
D
Level 3 input.
To unlock the question
Question 14
Multiple Choice

Using the BOM, if 2 units of A are needed, how many used of K will be required? Assume that there is no on-hand inventory of any items. image

Choose correct answer/s
A
16
B
34
C
52
D
104
To unlock the question
Question 15
Multiple Choice

Which of the following is NOT included in the information about the inventory records file for an item?

Choose correct answer/s
A
Safety stock
B
Preferred order quantity
C
Net requirements
D
Lead time
To unlock the question
Question 16
Multiple Choice

Jones Company uses widgets as component parts.In a particular week it has gross requirements for 250 units of widgets, beginning inventory of 50 widgets, and scheduled receipts of 350 widgets.Available inventory for the next period is:

Choose correct answer/s
A
650.
B
50.
C
250.
D
150.
To unlock the question
Question 17
Multiple Choice

An MRP record for a motor is shown in the following table. image What is the planned order release for week 4?

Choose correct answer/s
A
0
B
10,000
C
8,000
D
6,000
To unlock the question
Question 18
Multiple Choice

Significant changes in an MPS quantity several weeks into the planning horizon can:

Choose correct answer/s
A
Make the MRP more accurate.
B
Cause inconsistencies in the MRP.
C
Reduce stockouts.
D
Increase safety stock.
To unlock the question
Question 19
Multiple Choice

Constant changing of the master schedule and the resulting changes in the requirements for components is referred to as:

Choose correct answer/s
A
Master schedule dynamics.
B
System nervousness.
C
Bad planning.
D
MRP failure.
To unlock the question
Question 20
Multiple Choice

The positioning and replenishment of finished goods inventories at the retail level can be determined using:

Choose correct answer/s
A
MRP.
B
CRP.
C
DRP.
D
RFID.
To unlock the question